Click here to Skip to main content
11,721,289 members (83,376 online)
Rate this: bad
good
Please Sign up or sign in to vote.
Dear all,
My application calls the backend stored procedure and get the results to the dataset, in the mean time i need to display the status of the procedure execution in my progress bar control in my Frontend Form. Please anyone give the idea to do this.

Regards,
Bluesathish.
Posted 2-Jan-12 0:26am

1 solution

Rate this: bad
good
Please Sign up or sign in to vote.

Solution 1

You can set the Style property of progress bar to 'Marquee'
  Permalink  
Comments
bluesathish at 2-Jan-12 7:16am
   
Hi Raimis9,
Thanks for your reply, I knew about it. But my problem is i've to show the progressbar blocks while the procedure runs, it should gets its maximum when procedure returns the results. Can you give idea for this?
Raimis9 at 2-Jan-12 7:32am
   
Hi, I'm not sure is it possible at all to get real progress indication. You can "simulate" indication. For example , if SP runs about one minute, increase progress bar value each second or two and after the dataset is filled, set the maximum value to the bar.
bluesathish at 3-Jan-12 23:41pm
   
yeah, its a good idea.but what is the upper limit to be given for the progress bar, because each time the SP returns different results.

This content, along with any associated source code and files, is licensed under The Code Project Open License (CPOL)

  Print Answers RSS
0 Sergey Alexandrovich Kryukov 515
1 OriginalGriff 279
2 Mika Wendelius 170
3 F-ES Sitecore 150
4 cyycoish 70
0 Sergey Alexandrovich Kryukov 2,209
1 OriginalGriff 969
2 F-ES Sitecore 660
3 Maciej Los 609
4 Richard MacCutchan 560


Advertise | Privacy | Mobile
Web02 | 2.8.150901.1 | Last Updated 2 Jan 2012
Copyright © CodeProject, 1999-2015
All Rights Reserved. Terms of Service
Layout: fixed | fluid

CodeProject, 503-250 Ferrand Drive Toronto Ontario, M3C 3G8 Canada +1 416-849-8900 x 100