Add your own alternative version
Stats
40.7M views 408.7K downloads 3.4K bookmarked
Posted
3 Nov 2003
|
Comments and Discussions
|
|
Sorry, not clear enough.
When you complete subtask 1, it is crossed out, and subtask 2 is created.
Subtask 2 does not show the start and due dates on the task grid.
You then complete subtask 2, and subtask 3 is created. Start and Due dates then appear for subtask 2 (completed). Subtask 3 again does not show start and due dates. And so on.
As mentioned, correct start and due dates are shown in the edit bar at all times.
|
|
|
|
|
Thx, I can reproduce it now.
Interestingly, the problem does not occur with recurring top-level tasks, which is what I was doing.
|
|
|
|
|
Phew.
Please note, I haven't tested any other permutations of this (e.g. use same task...)
|
|
|
|
|
No worries, I will do some extra testing when I've fixed it.
Thx, as always, for your contributions.
|
|
|
|
|
More than welcome. TDL is a fantastic tool, and key to my personal management. If I can do a little to help then that is great.
It is us (the community) that should be thanking you. Your responsiveness and care for this software is incredible.
|
|
|
|
|
Can you confirm whether these were fixed in 6.6.b3?
|
|
|
|
|
|
Using 6.6a5. Due date does not calculate when selecting the calculation latest of the subtasks. Start date seems fine.
Will check b1 tomorrow. [Edit] Having trouble downloading b2 - will try from home later.
Also: adding one of my icons to a custom icon attribute, causes the column to increase significantly in width (at least 7 times the width of the icon). This doesn't happen when adding a built in icon.
[Edit: Both Issues are still present in V6.6b2]
For the future... I would find it useful to be able to see which values are calculated and which aren't. Perhaps when TDL gets the ability to alter text formatting, the calculated values might appear italicized or something like that.
Out of curiosity, where are the built in icons stored - in the exe itself?
zajchapp
modified 22-Jan-13 15:18pm.
|
|
|
|
|
zajchapp wrote: [Edit: Both Issues are still present in V6.6b2] Thx, I can reproduce both of these.
zajchapp wrote: Perhaps when TDL gets the ability to alter text formatting Don't hold your breath!
zajchapp wrote: the calculated values might appear italicized or something like that. Perhaps a simple marker would be sufficient.
|
|
|
|
|
|
When add a Task, set Recurrence "Yearly" ,"Dec 2" and "from comlpetion date"
And, Set Due Date is 2013/1/21
If I click cpmlete the task, the Due Date change to 2014/12/2. It Should be 2013/12/2.
|
|
|
|
|
Can you send me a simple tasklist that displays this problem and the necessary set of steps to reproduce it?
|
|
|
|
|
I encountered a strange problem, sometimes when to start the program, found that the configuration is reset. After checking the size of ToDoList.ini become 0. Administrator to check, thank you
calmman.yang@163.com
|
|
|
|
|
Do you ever 'forcibly' shutdown Windows without letting all your applications close?
|
|
|
|
|
Sometimes would be have any way to solve it?
thank you!
|
|
|
|
|
|
Can you check for the presence of a 'ToDoList.bak.ini' file?
|
|
|
|
|
no, I can't find the file. make a rar file is my way.
|
|
|
|
|
The software always creates a backup before saving the preferences and only deletes it if the save was successful.
And if it finds this backup next time it starts, it replaces the default preferences.
|
|
|
|
|
Hi, Dan:
Prior to 6.1B1, the %complete field in the task entry pane used to have little "clickers" (sorry, don't know the right name) that you could click to advance or retard the %-complete value, in increments as set in Preferences.
Those clickers are not present in my 6.6-b1. You can enter the %complete as a number, but not click to advance.
=John
|
|
|
|
|
Hi John
This is an old problem that _was_ fixed. Can you send me a screenshot so that I can see if it's related to your visual layout?
|
|
|
|
|
Well, I'm embarrassed to admit that this seems to have "fixed itself". I went to get the screen-shot, and the clickers were there(!). I had done a reboot and installed a bunch of updates from Microsoft -- not sure if that had anything to do with it.
So for now please ignore this one.
Regards,
=John
|
|
|
|
|
johnrhutchinson wrote: So for now please ignore this one. No worries. Let me know the moment it reappears.
|
|
|
|
|
Hi Dan,
there is a bug in the recurrence dialog.
- open a recurrence dialog on a task that occurs once
- select 'Yearly'
'Every' is selected and you can select month and day
- select 'The'
- select 'Every'
month and day stay greyed and can't be selected
Patrice
“Everything should be made as simple as possible, but no simpler.” Albert Einstein
|
|
|
|
|
|
|
General News Suggestion Question Bug Answer Joke Praise Rant Admin
Use Ctrl+Left/Right to switch messages, Ctrl+Up/Down to switch threads, Ctrl+Shift+Left/Right to switch pages.
|
|