SIcon Gantt Chart

Rate me:
Please Sign up or sign in to vote.
4.48/5 (18 votes)
11 Jun 2008GPL33 min read 173.8K   4.3K   97   39
A fast and innovative Gantt chart using JScript.

Image 1

Introduction

I am developing a web based application which allows the management of tasks and events of projects. A Gantt chart is needed for displaying a task list visually, and I tried to find a freely available solution (because I didn't want the budget to increase). I found some, but not really good ones. So, I decided to build one on my own. This is the first result of my work. This first version of SIcon was built in just a few hours, so I think it still has some problems. However, I want to share with you the idea. Hope this helps.

SIcon now supports FireFox!

Background

Some knowledge about JScript and CSS is enough for understanding and using this.

Using the code

The code is not really complex, so I will show all of it here:

JavaScript
/* --------- SICON GANTT CHART ---------------------------------------------------------
* AUTHOR        : Dathq - ICT Service Engineering Jsc, - dathq@ise.com.vn
* LICENSE        : Free
* DESCRIPTION    : Create a new task item with these info
*        - from: start date (format: mm/dd/dddd)
*        - to: deadline of task (format: mm/dd/dddd)
*        - task: name of the task, what has to be solved (not includes ')
*        - resource: who have to solve this task (not includes ')
*        - progress: how is it going? (format: integer value from 0 to 100,
*                    not includes %)
*--------------------------------------------------------------------------------------*/
function Task(from, to, task, resource, progress)
{
    var _from = new Date();    
    var _to = new Date();
    var _task = task;
    var _resource = resource;                        
    var _progress = progress;
    var dvArr = from.split('/');
    _from.setFullYear(parseInt(dvArr[2], 10), parseInt(dvArr[0], 10) - 1,
        parseInt(dvArr[1], 10));
    dvArr = to.split('/'); 
    _to.setFullYear(parseInt(dvArr[2], 10), parseInt(dvArr[0], 10) - 1,
        parseInt(dvArr[1], 10));        

    this.getFrom = function(){ return _from};
    this.getTo = function(){ return _to};
    this.getTask = function(){ return _task};
    this.getResource = function(){ return _resource};
    this.getProgress = function(){ return _progress};
}

function Gantt(gDiv)
{
    var _GanttDiv = gDiv;
    var _taskList = new Array();        
    this.AddTaskDetail = function(value)
    {
        _taskList.push(value);

    }
    this.Draw = function()
    {
        var _offSet = 0;
        var _dateDiff = 0;
        var _currentDate = new Date();
        var _maxDate = new Date();
        var _minDate = new Date();    
        var _dTemp = new Date();
        var _firstRowStr = "<table border=1 style='border-collapse:collapse'><tr>
           <td rowspan='2' width='200px' style='width:200px;'>
           <div class='GTaskTitle' style='width:200px;'>Task</div></td>";
        var _thirdRow = ""; 
        var _gStr = "";        
        var _colSpan = 0;
        var counter = 0;

        _currentDate.setFullYear(_currentDate.getFullYear(), _currentDate.getMonth(),
            _currentDate.getDate());
        if(_taskList.length > 0)
        {
            _maxDate.setFullYear(_taskList[0].getTo().getFullYear(),
                _taskList[0].getTo().getMonth(), _taskList[0].getTo().getDate());
            _minDate.setFullYear(_taskList[0].getFrom().getFullYear(),
                _taskList[0].getFrom().getMonth(), _taskList[0].getFrom().getDate());
            for(i = 0; i < _taskList.length; i++)
            {
                if(Date.parse(_taskList[i].getFrom()) < Date.parse(_minDate))
                    _minDate.setFullYear(_taskList[i].getFrom().getFullYear(),
                    _taskList[i].getFrom().getMonth(), _taskList[i].getFrom().getDate());
                if(Date.parse(_taskList[i].getTo()) > Date.parse(_maxDate))
                    _maxDate.setFullYear(_taskList[i].getTo().getFullYear(),
                    _taskList[i].getTo().getMonth(), _taskList[i].getTo().getDate()); 
            }

            //---- Fix _maxDate value for better displaying-----
            // Add at least 5 days

            if(_maxDate.getMonth() == 11) //December
            {
                if(_maxDate.getDay() + 5 > getDaysInMonth(_maxDate.getMonth() + 1,
                    _maxDate.getFullYear()))
                    //The fifth day of next month will be used
                    _maxDate.setFullYear(_maxDate.getFullYear() + 1, 1, 5);       
            else
                    //The fifth day of next month will be used
                    _maxDate.setFullYear(_maxDate.getFullYear(), _maxDate.getMonth(),
                        _maxDate.getDate() + 5);            }
            else
            {
                if(_maxDate.getDay() + 5 > getDaysInMonth(_maxDate.getMonth() + 1,
                    _maxDate.getFullYear()))
                    //The fifth day of next month will be used
                    _maxDate.setFullYear(_maxDate.getFullYear(), _maxDate.getMonth() + 1,
                        5);
                else
                    //The fifth day of next month will be used
                    _maxDate.setFullYear(_maxDate.getFullYear(), _maxDate.getMonth(),
                        _maxDate.getDate() + 5);
            }

            //--------------------------------------------------

            _gStr = "";
            _gStr += "</tr><tr>";
            _thirdRow = "<tr><td> </td>";
            _dTemp.setFullYear(_minDate.getFullYear(), _minDate.getMonth(),
                _minDate.getDate());
            while(Date.parse(_dTemp) <= Date.parse(_maxDate))
            {    
                if(_dTemp.getDay() % 6 == 0) //Weekend
                {
                    _gStr += "<td class='GWeekend'><div style='width:24px;'>" +
                        _dTemp.getDate() + "</div></td>";
                    if(Date.parse(_dTemp) == Date.parse(_currentDate))                   
                        _thirdRow += "<td id='GC_" + (counter++) + 
                        "' class='GToDay' style='height:" +
                        (_taskList.length * 21) + "'> </td>";
                    else
                        _thirdRow += "<td id='GC_" + (counter++) +
                        "' class='GWeekend' style='height:" + (_taskList.length * 21) +
                        "'> </td>";
                }
                else
                {
                    _gStr += "<td class='GDay'><div style='width:24px;'>" +
                        _dTemp.getDate() + "</div></td>";
                    if(Date.parse(_dTemp) == Date.parse(_currentDate))                   
                        _thirdRow += "<td id='GC_" + (counter++) +
                        "' class='GToDay' style='height:" + (_taskList.length * 21) +
                        "'> </td>";
                    else
                        _thirdRow += "<td id='GC_" + (counter++) + 
                       "' class='GDay'> </td>";
                }
                if(_dTemp.getDate() < getDaysInMonth(_dTemp.getMonth() + 1,
                    _dTemp.getFullYear()))
                {
                    if(Date.parse(_dTemp) == Date.parse(_maxDate))
                    {                            
                        _firstRowStr += "<td class='GMonth' colspan='" + 
                       (_colSpan + 1) + "'>T" + (_dTemp.getMonth() + 1) + "/" + 
                       _dTemp.getFullYear() + "</td>"; 
                    }
                    _dTemp.setDate(_dTemp.getDate() + 1);
                    _colSpan++;
                }                    
                else 
                {
                    _firstRowStr += "<td class='GMonth' colspan='" +
                        (_colSpan + 1) + "'>T" + (_dTemp.getMonth() + 1) +
                        "/" + _dTemp.getFullYear() + "</td>";
                    _colSpan = 0;
                    if(_dTemp.getMonth() == 11) //December
                    {
                        _dTemp.setFullYear(_dTemp.getFullYear() + 1, 0, 1);
                    }
                    else
                    {
                        _dTemp.setFullYear(_dTemp.getFullYear(),
                            _dTemp.getMonth() + 1, 1);
                    }
                }                    
            }
            _thirdRow += "</tr>";                 
            _gStr += "</tr>" + _thirdRow;                
            _gStr += "</table>";
            _gStr = _firstRowStr + _gStr;                
            for(i = 0; i < _taskList.length; i++)
            {
                _offSet = (Date.parse(_taskList[i].getFrom()) - Date.parse(_minDate)) /
                    (24 * 60 * 60 * 1000);
                _dateDiff = (Date.parse(_taskList[i].getTo()) - 
                    Date.parse(_taskList[i].getFrom())) / (24 * 60 * 60 * 1000) + 1;
                _gStr += "<div style='position:absolute; top:" + (20 * (i + 2)) + 
                "; left:" + (_offSet * 27 + 204) + "; width:" + 
                (27 * _dateDiff - 1 + 100) + "'><div title='" + 
                _taskList[i].getTask() + "' class='GTask' style='float:left; width:" +
                (27 * _dateDiff - 1) + "px;'>" +
                getProgressDiv(_taskList[i].getProgress()) +
                "</div><div style='float:left; padding-left:3'>" + 
                _taskList[i].getResource() + "</div></div>";
                _gStr += "<div style='position:absolute; top:" +
                    (20 * (i + 2) + 1) + "; left:5px'>" + _taskList[i].getTask() +
                    "</div>";
            }
            _GanttDiv.innerHTML = _gStr;
        }
    }
}        

function getProgressDiv(progress)
{
    return "<div class='GProgress' style='width:" + progress +
       "%; overflow:hidden'></div>"
}
// GET NUMBER OF DAYS IN MONTH
function getDaysInMonth(month, year)  
{

    var days;        
    switch(month)
    {
    case 1:
    case 3:
    case 5:
    case 7:
    case 8:
    case 10:
    case 12:
        days = 31;
        break;
    case 4:
    case 6:
    case 9:
    case 11:
        days = 30;
        break;
    case 2:
        if (((year% 4)==0) && ((year% 100)!=0) || ((year% 400)==0))                
            days = 29;                
        else                                
            days = 28;                
        break;
    }
    return (days);
}                
/*----- END OF MY CODE FOR Gantt CHART GENERATOR -----*/

How to Use this Script

In the body of your HTML, ASCX, ASPX, or PHP document... put these lines where you want to display the Gantt chart.

HTML
<body>    
    <h3>Diagram</h3>    
    <div style="position:relative" class="Gantt" id="GanttChart"></div>
</body>
<script>
    var g = new Gantt(document.all.GanttChart);
    g.AddTaskDetail(new Task('2/11/2008', '2/12/2008', 
                    '<b>Sample task 1 1</b>', 'Dathq', 50));
    g.AddTaskDetail(new Task('2/16/2008', '2/19/2008', 
                    '... Sample task 1.1', 'Dathq, Thanhdd', 30));
    g.AddTaskDetail(new Task('2/12/2008', '3/4/2008', 'Sample task 2', 'Hanhnd', 60));
    g.AddTaskDetail(new Task('2/11/2008', '2/16/2008', 'Sample task 3', 'Dathq', 50));
    
    g.Draw();    
</script>

Use the var g = new Gantt(document.all.GanttChart); statement for rendering your Gantt chart to the div element named "GanttChart" (you can see it in the body).

The g.AddTaskDetail() method adds a task to the task list. You can use AJAX or anything you like to generate these commands for adding the set of tasks.

Use g.Draw() for rendering the Gantt chart based on the task list which was added to the Gantt chart object.

How can I change the look of this component

Here, I have defined some classes for customizing the Gantt chart, with full source code provided. You can define more classes and also can change the face of the Gantt chart very easily.

By changing the style sheets, and adding some attributes for the task object in my code, you can make yourself a smart Gantt chart. For example: a different color for the task bar, a nice background image, a better tooltip for the chart,..

HTML
/*----- SICON GANTT CHART STYLE CLASSES --------------------------
* DESCRIPTION    : Theses class is required for SIcon Gantt Chart
* NOTE            : Should change the color, the text style only
*----------------------------------------------------------------*/
.Gantt
{
    font-family:tahoma, arial, verdana;
    font-size:11px;
}

.GTaskTitle
{
    font-family:tahoma, arial, verdana;
    font-size:11px;
    font-weight:bold;
}

.GMonth
{
    padding-left:5px;
    font-family:tahoma, arial, verdana;
    font-size:11px;
    font-weight:bold;    
}

.GToday
{
    background-color: #FDFDE0;    
}

.GWeekend
{
    font-family:tahoma, arial, verdana;
    font-size:11px;
    background-color:#F5F5F5;
    text-align:center;
}

.GDay
{
    font-family:tahoma, arial, verdana;
    font-size:11px;
    text-align:center;
}

.GTask
{
    border-top:1px solid #CACACA;
    border-bottom:1px solid #CACACA;
    height:14px;
    background-color:yellow;
}

.GProgress
{
    background-color:black;
    height:2px;
    overflow: hidden;
    margin-top:5px;
}

Diagram

C#
var g = new Gantt(document.all.GanttChart);
g.AddTaskDetail(new Task('2/11/2008', '2/19/2008', 'Sample task 1 1', 'Dathq', 50));
g.AddTaskDetail(new Task('2/16/2008', '2/19/2008', '... Sample task 1.1', 
    'Dathq, Thanhdo', 30));
g.AddTaskDetail(new Task('2/12/2008', '3/2/2008', 'Sample task 2', 'Hanhnd', 60));
g.AddTaskDetail(new Task('2/11/2008', '2/16/2008', 'Sample task 3', 'Dathq', 50));
g.AddTaskDetail(new Task('2/11/2008', '2/19/2008', 'Sample task 1 1', 'Dathq', 50));
g.AddTaskDetail(new Task('2/16/2008', '2/19/2008', '... Sample task 1.1',
    'Dathq, Thanhdo', 30));
g.AddTaskDetail(new Task('2/12/2008', '3/2/2008', 'Sample task 2', 'Hanhnd', 60));
g.AddTaskDetail(new Task('2/11/2008', '2/16/2008', 'Sample task 3', 'Dathq', 50));
g.AddTaskDetail(new Task('2/11/2008', '2/19/2008', 'Sample task 1 1', 'Dathq', 50));
g.AddTaskDetail(new Task('2/16/2008', '2/19/2008', '... Sample task 1.1',
    'Dathq, Thanhdo', 30));
g.AddTaskDetail(new Task('2/12/2008', '3/2/2008', 'Sample task 2', 'Hanhnd', 60));
g.AddTaskDetail(new Task('2/11/2008', '2/16/2008', 'Sample task 3', 'Dathq', 50));

g.AddTaskDetail(new Task('2/11/2008', '2/19/2008', 'Sample task 1 1', 'Dathq', 50));
g.AddTaskDetail(new Task('2/16/2008', '2/19/2008', '... Sample task 1.1',
     'Dathq, Thanhdo', 30));
g.AddTaskDetail(new Task('2/12/2008', '3/2/2008', 'Sample task 2', 'Hanhnd', 60));
g.AddTaskDetail(new Task('5/11/2008', '5/16/2008', 'Sample task 3', 'Dathq', 50));

g.Draw();

Points of Interest

The first point you will notice about the chart is that it runs very fast.

SIcon Gantt chart is built with JavaScript, which means you can use it in most cases of web development. With me, I like ASP.NET, and of course I can use this component with ASP.NET. Additionally, you can use it with AJAX for cooler applications. You can customize the CSS classes as you like, and get a "good looking" Gantt chart. I will try to add a link to the tasks for describing their relations and also a parent task displayed, as we can see in MS Project.

The Gantt chart is displayed withs HTML giving it a light weight structure, so you can add more features to the chart. For example, tooltip, link, image... with some basic changes within the Jscript code.

And the last one, it is total free.

Happy coding! :)

History

  • 27 Feb 2008: First version of SIcon Gantt chart.
  • 07 Jun 2008: Fixed display error with Firefox.

License

This article, along with any associated source code and files, is licensed under The GNU General Public License (GPLv3)


Written By
Web Developer ICT Service Engineering
Vietnam Vietnam
A developer come from Vietnam

Comments and Discussions

 
Questionare available to work on project for calendar view Pin
imohammed78616-Oct-20 13:44
imohammed78616-Oct-20 13:44 
QuestionGantt Chart Pin
margis5-Nov-13 12:52
margis5-Nov-13 12:52 
QuestionFreeze Task Name (Column) Pin
Mohammad Salman Sagar27-May-13 2:35
Mohammad Salman Sagar27-May-13 2:35 
AnswerRe: Freeze Task Name (Column) Pin
dathq5-Jun-13 17:06
dathq5-Jun-13 17:06 
GeneralRe: Freeze Task Name (Column) Pin
Mohammad Salman Sagar10-Jun-13 20:41
Mohammad Salman Sagar10-Jun-13 20:41 
GeneralRe: Freeze Task Name (Column) Pin
Member 76619305-Dec-16 2:59
professionalMember 76619305-Dec-16 2:59 
GeneralMy vote of 5 Pin
RK_Columbus14-Oct-10 7:30
RK_Columbus14-Oct-10 7:30 
JokeThe program seems to ignore many essential features of Gantt Pin
xiajingfeng23-Nov-08 19:59
xiajingfeng23-Nov-08 19:59 
GeneralRe: The program seems to ignore many essential features of Gantt Pin
dathq3-Dec-08 14:31
dathq3-Dec-08 14:31 
GeneralRe: The program seems to ignore many essential features of Gantt Pin
Watson Jason24-Jun-09 22:58
Watson Jason24-Jun-09 22:58 
GeneralMore than one bar per task Pin
sanjshah6-Oct-08 11:51
sanjshah6-Oct-08 11:51 
GeneralRe: More than one bar per task Pin
ilikebread16-Dec-08 18:48
ilikebread16-Dec-08 18:48 
GeneralRe: More than one bar per task Pin
sanjshah17-Dec-08 12:49
sanjshah17-Dec-08 12:49 
GeneralRe: More than one bar per task Pin
ilikebread17-Dec-08 17:40
ilikebread17-Dec-08 17:40 
GeneralRe: More than one bar per task Pin
sanjshah19-Dec-08 6:14
sanjshah19-Dec-08 6:14 
GeneralTasks size Pin
User 54001198-Aug-08 6:15
User 54001198-Aug-08 6:15 
GeneralRe: Tasks size Pin
User 54001198-Aug-08 6:31
User 54001198-Aug-08 6:31 
General"document.all has no properties" Pin
cl2kliss6-Aug-08 2:46
cl2kliss6-Aug-08 2:46 
GeneralRe: "document.all has no properties" Pin
cl2kliss6-Aug-08 4:29
cl2kliss6-Aug-08 4:29 
QuestionUsing this with ASP.net Pin
pimentinho22-Jul-08 17:25
pimentinho22-Jul-08 17:25 
Questiongantt is undefined [modified] Pin
karthikmp15-Jul-08 3:08
karthikmp15-Jul-08 3:08 
GeneralAdjust Day Widths Pin
Sethran1-Jul-08 9:24
Sethran1-Jul-08 9:24 
QuestionRe: Adjust Day Widths Pin
Member 28934778-Jul-08 0:56
Member 28934778-Jul-08 0:56 
Yes, I also would like to know about this because I am showing my data from 1st of every month If I got the task from 15th or 20th or any of the date of that particular month.
So when I am showing the data the process line is not coming at the same place. I have tried to debug it but what I felt is u are using _offSet = (Date.parse(_taskList[i].getFrom()) - Date.parse(_minDate)) / (24 * 60 * 60 * 1000); for the starting point. but I don't want this thing. I want to show the data with my effective date on which exactly the task has been started.

I would appreciate the help.

Thanks in Advance
Generalupdateable AJAX gantt chart Pin
SUN RULEZ!!!13-Jun-08 7:33
SUN RULEZ!!!13-Jun-08 7:33 
GeneralRe: updateable AJAX gantt chart Pin
dathq13-Jun-08 15:45
dathq13-Jun-08 15:45 

General General    News News    Suggestion Suggestion    Question Question    Bug Bug    Answer Answer    Joke Joke    Praise Praise    Rant Rant    Admin Admin   

Use Ctrl+Left/Right to switch messages, Ctrl+Up/Down to switch threads, Ctrl+Shift+Left/Right to switch pages.