Click here to Skip to main content
15,895,142 members
Please Sign up or sign in to vote.
0.00/5 (No votes)
See more:
I'm doing with a rail locomotive positioning system.
The problem or goal is to analyze which rail track a locomotive is running on if multiple parallel rail tracks exisit.
Status of rail switches and the distance from a locomotive to the nearest calibration devices(by using RFID) are known.
The trackes, switches and locomotives are processed in the RAM as a graph.
I really appreciate your helps.
Posted
Updated 12-Jun-14 20:47pm
v3

This content, along with any associated source code and files, is licensed under The Code Project Open License (CPOL)



CodeProject, 20 Bay Street, 11th Floor Toronto, Ontario, Canada M5J 2N8 +1 (416) 849-8900