Introduction

Simple way to manage project and show progress on Gantt chart, it is on web application and there is no limitation to use it, so if some part of your project are in sites where are far from each other, you can use it and gather real data from users who are involved to same project. When you are involved in a project, you have to control affairs; otherwise we will have to pay its consequences which may be serious. I have not seen a complete package for controlling project in free. I have prepared essential parts which are needed for monitoring project resources.

Background: What is Project Management?

Project is set of activities to improve and enhance products or services. People comes together temporarily to perform tasks which have specific start and end point until they can achieve desire result. Project control is to manage resources and have best feedback; goal in this area is to reach high quality in products or services in short time with at least cost. So we have a scope which can be changed overtime based on conditions.

Image 2

Project manager is responsible to ensure us that project is still in an acceptance level. He or she has to define priority in tasks and resources and specify a reasonable time interval for each task then he or she should give us feedback. In a better words project management is summarized in 7 steps as I describe follow.

Project Management:

  1. Specify requirements
  2. Plan, which task has to be done by whom in what standard?
  3. Gather members then motivate and encourage them
  4. Monitor and supervise process
  5. Take control changes and don`t allow to have any variance

If you want to know more about it please visit this link

For an instance I have designed a sample flowchart for trading projects which is based on my experiences, there are some tasks in this example which can be useful for task definition. They are belonging to dealer companies which are placed between providers (principals or factories) and customers.

Image 3

Image 4

Image 5

You have two choices you can insert these tasks in your Data Base from your application directly or these are available in your MS Project file before. In second case you have to save your sheet in xml format like below picture. In this article I have selected 'PM' for file name. As you know some tasks in project are parent and another ones are set of tasks which are related to each other in the respect of their duties. For instance in trading companies inquiry and send catalog are set of sections which are related to marketing phase so I called them such as:

Group: Marketing

  • Block 1: Inquiry
  • Block 2: Send Catalog

Or

  • Group: Transport
  • Block 1: Shipment
  • Block 2: Inspection Company
  • Block 3: Insurance

Sample Image - maximum width is 600 pixels

These names are depend on project manager`s decisions. In this article I have inserted tasks to data base and then I have assigned for each project its groups and blocks for each group I have assigned a color, so we can track progress better in Gantt Chart with different colors, after that in another page I have defined blocks for each group, each blocks has specific start and end date. These points for start and end dates are something similar to predict progress and are not real, for have a real progress you can add some pages to your application and your users can log in to profile and insert exact time and cost for each blocks. Finally for get a result from it , you can go to DemoRequest.aspx and give your project name, year and season and click on show guntt chart, then you can see progress of your project. In this part I have used from eventcalendercontrol component if you want to know more about this control please visit this link: visit this link, and if you want to enhance your application with AJAX technology, please visit follow links:

DataBase

New Query

Project

SQL
CREATE TABLE [dbo].[tblProject](
	[ProjID] [int] NOT NULL,
	[ProjName] [nchar](90) NULL,
 CONSTRAINT [PK_tblProject] PRIMARY KEY CLUSTERED 
(
	[ProjID] ASC
)WITH (PAD_INDEX  = OFF, STATISTICS_NORECOMPUTE  = OFF, IGNORE_DUP_KEY = OFF, ALLOW_ROW_LOCKS  = ON, ALLOW_PAGE_LOCKS  = ON) ON [PRIMARY]
) ON [PRIMARY]

insert into dbo.tblProject(ProjID, ProjName) values(1,'DAEWOO')
insert into dbo.tblProject(ProjID, ProjName) values(1,'DANTHERM')

Task

SQL
CREATE TABLE [dbo].[tbl_Task](
	[Task_ID] [int] IDENTITY(1,1) NOT NULL,
	[Task_Name] [nchar](500) NULL,
 CONSTRAINT [PK_tbl_Task] PRIMARY KEY CLUSTERED 
(
	[Task_ID] ASC
)WITH (PAD_INDEX  = OFF, STATISTICS_NORECOMPUTE  = OFF, IGNORE_DUP_KEY = OFF, ALLOW_ROW_LOCKS  = ON, ALLOW_PAGE_LOCKS  = ON) ON [PRIMARY]
) ON [PRIMARY]

Group

SQL
CREATE TABLE [dbo].[tblGroup](
	[gid] [int] IDENTITY(1,1) NOT NULL,
	[name] [nvarchar](300) NULL,
	[blockcolor] [nvarchar](300) NULL,
	[ProjID] [int] NOT NULL,
 CONSTRAINT [PK_tblGroup] PRIMARY KEY CLUSTERED 
(
	[gid] ASC
)WITH (PAD_INDEX  = OFF, STATISTICS_NORECOMPUTE  = OFF, IGNORE_DUP_KEY = OFF, ALLOW_ROW_LOCKS  = ON, ALLOW_PAGE_LOCKS  = ON) ON [PRIMARY]
) ON [PRIMARY]

Block

SQL
CREATE TABLE [dbo].[tblBlock](
	[bid] [int] IDENTITY(1,1) NOT NULL,
	[name] [nvarchar](500) NULL,
	[StartDate] [nvarchar](100) NULL,
	[EndDate] [nvarchar](100) NULL,
	[href] [nvarchar](100) NULL,
	[ProjID] [int] NOT NULL,
	[gid] [int] NOT NULL,
 CONSTRAINT [PK_tblBlock] PRIMARY KEY CLUSTERED 
(
	[bid] ASC
)WITH (PAD_INDEX  = OFF, STATISTICS_NORECOMPUTE  = OFF, IGNORE_DUP_KEY = OFF, ALLOW_ROW_LOCKS  = ON, ALLOW_PAGE_LOCKS  = ON) ON [PRIMARY]
) ON [PRIMARY]

Stored Procedure

SQL
CREATE PROCEDURE 
    [dbo].[sptblTask_Insert](
	@Task_Name nvarchar(500)
	
)

AS 

INSERT INTO tbl_Task( 
       	Task_Name
)
        
VALUES ( 
	@Task_Name
	
)

Web Application

Task

Create a web page and name it task.aspx. Put it: upload file, repeater, 2 buttons

Sample Image - maximum width is 600 pixels

 

VB Code

 

VB
Imports System.IO
Imports System.Data
Imports System.Data.SqlClient
Partial Class _Default
    Inherits System.Web.UI.Page

    Dim cn As New SqlClient.SqlConnection()
    Dim cmd As New SqlClient.SqlCommand

    Protected Sub btn_Upload_Click(ByVal sender As Object, ByVal e As System.EventArgs) Handles btn_Upload.Click
        Try

            Dim dirname As String = Page.MapPath("~/App_Data/")

            If Directory.Exists(dirname) = False Then

                Directory.CreateDirectory(dirname)

            End If

            Dim strfilename As String() = FileUpload1.PostedFile.FileName.Split("\")
            Dim strp As String = strfilename(UBound(strfilename))

            If strp = "PM.xml" Then


                Dim strtotla As String = strp
                FileUpload1.PostedFile.SaveAs(Request.MapPath("~/App_Data/" & "\" & strtotla))

                'Message 
                Dim strMessage2 As String = "File was uploaded Successfully"
                Dim strScript2 As String = "<script language=JavaScript>"
                strScript2 += "alert(""" & strMessage2 & """);"
                strScript2 += "</script>"

                If (Not Page.IsStartupScriptRegistered("clientScript")) Then
                    Page.RegisterStartupScript("clientScript", strScript2)
                End If
            Else
                'Message 
                Dim strMessage2 As String = "Please select file with sariak name and xml extension"
                Dim strScript2 As String = "<script language=JavaScript>"
                strScript2 += "alert(""" & strMessage2 & """);"
                strScript2 += "</script>"

                If (Not Page.IsStartupScriptRegistered("clientScript")) Then
                    Page.RegisterStartupScript("clientScript", strScript2)
                End If
            End If
        Catch ex As Exception
        End Try
    End Sub

    Protected Sub btn_Show_Click(ByVal sender As Object, ByVal e As System.EventArgs) Handles btn_Show.Click
        Dim Tasks As New DataSet
        Tasks.ReadXml(Server.MapPath("~/App_Data/PM.xml"))

        Dim results As DataRow()

        results = Tasks.Tables("Task").Select()

        Dim tb As DataTable

        tb = results(0).Table.Clone()

        ' we need to add the rows to a table , because we can't use the arry of rows as a datasource 
        Dim dr As DataRow

        For Each dr In results


            tb.ImportRow(dr)

        Next

        'here you can assign the tb to any data presentaion control ,\
        'you can use GridView because of  its auto genrate columns , its simple
        'for ListView , you need to build the Layout and the ItemTemplate , i did a one for you which has a bad look :)
        Me.Repeater1.DataSource = tb
        Me.Repeater1.DataBind()
    End Sub

    Protected Sub btnInsert_Click(ByVal sender As Object, ByVal e As System.EventArgs) Handles btnInsert.Click
        Dim strCon As String = "Data Source=. ;Initial Catalog=MyDB ;Integrated Security=True"
        cn.ConnectionString = strCon
        Dim Tasks As New DataSet
        Tasks.ReadXml(Server.MapPath("~/App_Data/PM.xml"))

        Dim results As DataRow()

        results = Tasks.Tables("Task").Select()

        Dim tb As DataTable

        tb = results(0).Table.Clone()

        ' we need to add the rows to a table , because we can't use the arry of rows as a datasource 
        Dim dr As DataRow

        For Each dr In results

            tb.ImportRow(dr)

        Next

        cn.Open()

        cmd.Connection = cn
        cmd.CommandType = CommandType.StoredProcedure
        cmd.CommandText = "sptblTask_Insert"
        '=====START INTERDUSE PARAMETERS==========
        Dim Task_Name As New SqlParameter("@Task_Name ", SqlDbType.NVarChar, 3000)
        cmd.Parameters.Add(Task_Name)
        Task_Name.Direction = ParameterDirection.Input
        Dim i2 As Integer = CInt(tb.Rows.Count.ToString())
        Dim I As Integer

        Try

            For I = 0 To i2 - 1
                Task_Name.Value = Tasks.Tables("Task").Rows(I).ItemArray(2).ToString()
                cmd.ExecuteNonQuery()
            Next

            Dim strMessage2 As String = "Tasks have been saved successfully"
            Dim strScript2 As String = "<script language=JavaScript>"
            strScript2 += "alert(""" & strMessage2 & """);"
            strScript2 += "</script>"
            'Show Message
            If (Not Page.IsStartupScriptRegistered("clientScript")) Then
                Page.RegisterStartupScript("clientScript", strScript2)
            End If

        Catch ex As Exception
           

        End Try

    End Sub
End Class

C# Code

C#
using System;
using System.Collections;
using System.Configuration;
using System.Data;
using System.Linq;
using System.Web;
using System.Web.Security;
using System.Web.UI;
using System.Web.UI.HtmlControls;
using System.Web.UI.WebControls;
using System.Web.UI.WebControls.WebParts;
using System.Xml.Linq;
using System.Data.SqlClient;


public partial class Task : System.Web.UI.Page
{
    SqlConnection cn = new SqlConnection();
    SqlCommand cmd = new SqlCommand();
    
    protected void btnInsert_Click(object sender, EventArgs e)
    {
       
         DataSet Tasks =new DataSet();
         Tasks.ReadXml(Server.MapPath("~/App_Data/PM.xml"));

        //' we need to add the rows to a table , because we can't use the arry of rows as a datasource 

        string strCon = "Data Source=. ;Initial Catalog=MyDB ;Integrated Security=True";
        cn.ConnectionString = strCon;
        cmd.Connection = cn;
        cmd.CommandType = CommandType.StoredProcedure;
        cmd.CommandText = "sptblTask_Insert";
        //'=====START INTERDUSE PARAMETERS==========
         SqlParameter Task_Name=new SqlParameter("@Task_Name ", SqlDbType.NVarChar, 3000);
        cmd.Parameters.Add(Task_Name);
        Task_Name.Direction = ParameterDirection.Input;
        int i2 = Int32.Parse(Tasks.Tables["Task"].Rows.Count.ToString());
       
        try
        {
            cn.Open();
            for(int i = 0;  i<=i2 - 1;i++)
            {
                Task_Name.Value = Tasks.Tables["Task"].Rows[i].ItemArray[2].ToString();
                cmd.ExecuteNonQuery();
            }
        }
           
            
      catch (Exception ex)
          {}
      finally 
        {
            cn.Close();
        }
    }
    
    protected void btn_Show_Click(object sender, EventArgs e)
    {
        DataSet Tasks =new DataSet();
        Tasks.ReadXml(Server.MapPath("~/App_Data/PM.xml"));

        DataTable tb;     
      
        tb = Tasks.Tables["Task"];
        //'here you can assign the tb to any data presentaion control ,\
        //'you can use GridView because of  its auto genrate columns , its simple
        //'for ListView , you need to build the Layout and the ItemTemplate , i did a one for you which has a bad look :)
        this.Repeater1.DataSource = tb;
        this.Repeater1.DataBind();
    }
    protected void  btn_Upload_Click(object sender, EventArgs e)
{
      try
      {

           
    if( ( FileUpload1.PostedFile != null ) && ( FileUpload1.PostedFile.ContentLength > 0 ) )
{
	string fn = System.IO.Path.GetFileName(FileUpload1.PostedFile.FileName);
	string SaveLocation = Server.MapPath("~/App_Data/") + "\\" +  fn;
	try
	{
		FileUpload1.PostedFile.SaveAs(SaveLocation);
		Response.Write("The file has been uploaded.");
	}
	catch ( Exception ex )
	{
		Response.Write("Error: " + ex.Message);
		//Note: Exception.Message returns a detailed message that describes the current exception. 
		//For security reasons, we do not recommend that you return Exception.Message to end users in 
		//production environments. It would be better to put a generic error message. 
	}
}
else
{
	Response.Write("Please select a file to upload.");
}
               
      }   
        catch{}


}
}

Group

Create a web page and name it Group.aspx. Put it like picture:

Sample Image - maximum width is 600 pixels

 

VB Code

 

VB
Imports System.IO
Imports System.Data
Imports System.Data.SqlClient
Partial Class Group
    Inherits System.Web.UI.Page

    Dim cn As New SqlClient.SqlConnection()
    Dim cmd As New SqlClient.SqlCommand

    Protected Sub btn_Save_Click(ByVal sender As Object, ByVal e As System.EventArgs) Handles btn_Save.Click

        Dim strCon As String = "Data Source=. ;Initial Catalog=MyDB ;Integrated Security=True"
        cn.ConnectionString = strCon
        Dim strsql As String

         Try
            strsql += "insert into tblGroup(name,blockcolor,ProjID) values('"
            strsql += Me.txtGroup.Text + "',N'" + Me.drp_Color.Text + "'," + Me.drp_ProjName.SelectedValue.ToString() + ") "
            Dim objcommand As New SqlClient.SqlCommand(strsql, cn)

            cn.Open()
            objcommand.ExecuteNonQuery()

        Catch ex As Exception
        Finally
            cn.Close()
        End Try


    End Sub


End Class

C#  Code

C#
using System;
using System.Collections;
using System.Configuration;
using System.Data;
using System.Linq;
using System.Web;
using System.Web.Security;
using System.Web.UI;
using System.Web.UI.HtmlControls;
using System.Web.UI.WebControls;
using System.Web.UI.WebControls.WebParts;
using System.Xml.Linq;
using System.Data.SqlClient;


public partial class Group : System.Web.UI.Page
{
    
    protected void btn_Save_Click(object sender, EventArgs e)
    {
      SqlConnection cn=new SqlConnection();
      SqlCommand cmd = new SqlCommand();
        
      string strCon="Data Source=. ;Initial Catalog=MyDB ;Integrated Security=True";
      cn.ConnectionString = strCon;
      string strsql="";

        try
        {
            
            strsql += "insert into tblGroup(name,blockcolor,ProjID) values('" ;
            strsql += this.txtGroup.Text + "',N'" + this.drp_Color.Text + "'," + this.drp_ProjName.SelectedValue.ToString() + ") ";
            SqlCommand objcommand=new SqlCommand(strsql, cn);

            cn.Open();
            objcommand.ExecuteNonQuery();
        }
        catch
        {
        }
        finally
        {
            cn.Close();
        }
        
    }
}

Block:

Create a web page and name it Block.aspx. Put it like picture:

Sample Image - maximum width is 600 pixels

 

VB Code

 

VB
Imports System.IO
Imports System.Data
Imports System.Data.SqlClient
Partial Class Block
    Inherits System.Web.UI.Page

    Dim cn As New SqlClient.SqlConnection()

    Dim cmd As New SqlClient.SqlCommand

    Protected Sub btn_Save_Click(ByVal sender As Object, ByVal e As System.EventArgs) Handles btn_Save.Click
        

        Dim strCon As String = "Data Source=.;Initial Catalog=MyDB ;Integrated Security=True"
        cn.ConnectionString = strCon
        Dim strsql As String
        Dim strHref As String = "DemoDetails.aspx?ActID=" + Me.txtBlock.Text
       
        Try

            strsql += "insert into tblBlock(name,StartDate,EndDate,href,ProjID,gid) "
            strsql += " values('" + Me.txtBlock.Text + "','" + Me.txtStartDate.Text + "','" + Me.txtEndDate.Text + "','" + strHref + "',"
            strsql += Me.ddListProject.SelectedValue.ToString + "," + Me.ddListGroup.SelectedValue.ToString + ")"
            Dim objcommand As New SqlClient.SqlCommand(strsql, cn)

            cn.Open()
            objcommand.ExecuteNonQuery()

        Catch ex As Exception
        Finally
            cn.Close()
        End Try

    End Sub

    
End Class

C# Code

C#
using System;
using System.Collections;
using System.Configuration;
using System.Data;
using System.Linq;
using System.Web;
using System.Web.Security;
using System.Web.UI;
using System.Web.UI.HtmlControls;
using System.Web.UI.WebControls;
using System.Web.UI.WebControls.WebParts;
using System.Xml.Linq;
using System.Data.SqlClient;

public partial class Block : System.Web.UI.Page
{
    
 
    protected void btn_Save_Click(object sender, EventArgs e)
    {
        
        SqlConnection cn=new SqlConnection();
        SqlCommand cmd = new SqlCommand();
        string strCon= "Data Source=.;Initial Catalog=MyDB ;Integrated Security=True";
        cn.ConnectionString = strCon;
        string strsql="";
        string strHref= "DemoDetails.aspx?ActID=" + this.txtBlock.Text;
        
        string strGroup=this.ddListGroup.SelectedValue.ToString() ;
        string strProject = this.ddListProject.SelectedValue.ToString();
        try
        {
            strsql += "insert into tblBlock(name,StartDate,EndDate,href,ProjID,gid) values('";
            strsql += this.txtBlock.Text + "','" + this.txtStartDate.Text + "','" + this.txtEndDate.Text + "','";
            strsql += strHref + "'," + strProject + "," + strGroup + ")";
         
            SqlCommand objcommand = new SqlCommand(strsql, cn);

            cn.Open();
            objcommand.ExecuteNonQuery();
        }
            
        catch 
        {
        }
        finally
        {
            cn.Close();
        }
            
      
    }
}

DemoRequest

Create a web page and name it DemoRequest.aspx. Put it like picture:

Sample Image - maximum width is 600 pixels

 

VB Code

 

VB
Partial Class DemoRequest
    Inherits System.Web.UI.Page

    

    Protected Sub btnGo_Click(ByVal sender As Object, ByVal e As System.EventArgs) Handles btnGo.Click
        
        Dim strProj As String = Me.drpProject.SelectedValue.ToString()
        Dim strQrt As String = Me.drpQ.SelectedValue.ToString()
        Response.Redirect("DemoReport.aspx" & "?Project=" + strProj & "?" + strQrt & "?" + Me.txtYear.Text)
     
    End Sub
End Class

C# Code

C#
using System;
using System.Collections;
using System.Configuration;
using System.Data;
using System.Linq;
using System.Web;
using System.Web.Security;
using System.Web.UI;
using System.Web.UI.HtmlControls;
using System.Web.UI.WebControls;
using System.Web.UI.WebControls.WebParts;
using System.Xml.Linq;

public partial class DemoRequest : System.Web.UI.Page
{
    protected void Page_Load(object sender, EventArgs e)
    {

    }
    protected void btnGo_Click(object sender, EventArgs e)
    {
        string proj = this.drpProject.SelectedValue.ToString();
        Response.Redirect("DemoReport.aspx" + "?Project=" + proj + "?" + this.drpQ.SelectedValue.ToString() + "?" + this.txtYear.Text);
    }
}

DemoReport:

Create a web page and name it DemoReport.aspx. Put it like picture:


Image 11


Image 12

VB Code

VB
Imports System.Data
Imports System.Xml
Imports System.Xml.Schema
Imports System.Data.SqlClient
Partial Class DemoReport
    Inherits System.Web.UI.Page

    Dim strDemoAnticipate As String
    Dim strProj As String
    Dim strQrt As String
    Dim strYear As String

    Dim cn As New SqlClient.SqlConnection()
    Dim cmd As New SqlClient.SqlCommand
    Protected Sub Page_Load(ByVal sender As Object, ByVal e As System.EventArgs) Handles Me.Load

        Dim strCon As String = "Data Source=. ;Initial Catalog=MyDB ;Integrated Security=True"
        cn.ConnectionString = strCon

        '==============NESTED=================

        If Not IsNothing(Request.QueryString("Project")) Then
            strDemoAnticipate = Request.QueryString("Project")
        End If

        Dim strArr As String() = strDemoAnticipate.Split("?")
        strProj = strArr(0).ToString()
        strQrt = strArr(1).ToString()
        strYear = strArr(2).ToString()
         
        'It is very IMPORTANT that you do not allow to change the fields in group and block tables
        'Because these names are in the eventcalender DLL and just read xml data which are includde these names.
        
        Dim custDA As SqlDataAdapter = New SqlDataAdapter("select gid,name,blockcolor from tblGroup where ProjID=" + strProj, cn)
        Dim orderDA As SqlDataAdapter = New SqlDataAdapter("SELECT gid,href,StartDate,EndDate,name FROM tblBlock where ProjID=" + strProj, cn)

        cn.Open()

        Dim custDS As DataSet = New DataSet("NewDataSet")
        custDA.Fill(custDS, "group")
        orderDA.Fill(custDS, "block")

        cn.Close()
        Try
   
   Dim custOrderRel As DataRelation = custDS.Relations.Add("CustOrders", custDS.Tables("group").Columns("gid"), custDS.Tables("block").Columns("gid"))
   custOrderRel.Nested = True


        Catch ex As Exception

        End Try

        Dim MyXml As String = custDS.GetXml()

        EventCalendarControl1.XMLData = MyXml
        EventCalendarControl1.BlankGifPath = "trans.gif"
        EventCalendarControl1.Year = strYear
        EventCalendarControl1.Quarter = strQrt
        EventCalendarControl1.BlockColor = ""
        EventCalendarControl1.ToggleColor = "#dcdcdc"
        EventCalendarControl1.CellHeight = 10
        EventCalendarControl1.CellWidth = 10

    End Sub
End Class

C# Code

C#
using System;
using System.Collections;
using System.Configuration;
using System.Data;
using System.Linq;
using System.Web;
using System.Web.Security;
using System.Web.UI;
using System.Web.UI.HtmlControls;
using System.Web.UI.WebControls;
using System.Web.UI.WebControls.WebParts;
using System.Xml.Linq;
using System.Xml;
using System.Xml.Schema;
using System.Data.SqlClient;
public partial class DemoReport : System.Web.UI.Page
{
    string strDemoAnticipate;
    protected void Page_Load(object sender, EventArgs e)
    {

        
        string strProj;
        string strQrt;
        string strYear;

         SqlConnection cn =new SqlConnection();
         SqlCommand cmd =new SqlCommand();

         string strCon  = "Data Source=. ;Initial Catalog=MyDB ;Integrated Security=True";
         cn.ConnectionString = strCon;

        //'==============NESTED=================

       
            if (Request.QueryString["Project"] != null)
            {
                strDemoAnticipate = Request.QueryString["Project"];
            }

        string[] strArr= strDemoAnticipate.Split('?');
        strProj = strArr[0].ToString();
        strQrt = strArr[1].ToString();
        strYear = strArr[2].ToString();


        SqlDataAdapter custDA=new SqlDataAdapter("select gid,name,blockcolor from tblGroup where ProjID=" + strProj, cn);
        SqlDataAdapter orderDA =new SqlDataAdapter("SELECT gid,href,StartDate,EndDate,name FROM tblBlock where ProjID=" + strProj, cn);

        cn.Open();

        DataSet custDS=new DataSet("NewDataSet");
        custDA.Fill(custDS, "group");
        orderDA.Fill(custDS, "block");

        cn.Close();
        try
        {
   DataRelation custOrderRel  = custDS.Relations.Add("CustOrders", custDS.Tables["group"].Columns["gid"], custDS.Tables["block"].Columns["gid"]);
   custOrderRel.Nested = true;

        }
        
        catch
        {
        }
       

        string MyXml  = custDS.GetXml();

        EventCalendarControl1.XMLData = MyXml;
        EventCalendarControl1.BlankGifPath = "trans.gif";
        EventCalendarControl1.Year = Int32.Parse(strYear);
        EventCalendarControl1.Quarter = Int32.Parse(strQrt);
        EventCalendarControl1.BlockColor = "";
        EventCalendarControl1.ToggleColor = "#dcdcdc";
        EventCalendarControl1.CellHeight = 10;
        EventCalendarControl1.CellWidth = 10;

    }
}

In Design

<%@ Page Language="VB" AutoEventWireup="false" CodeFile="DemoReport.aspx.vb" Inherits="DemoReport" %>
<%@ Register Assembly="EventCalendarControl" Namespace="EventCalendar" TagPrefix="cc1" %>

<!DOCTYPE html PUBLIC "-//W3C//DTD XHTML 1.0 Transitional//EN" "http://www.w3.org/TR/xhtml1/DTD/xhtml1-transitional.dtd">

<html xmlns="http://www.w3.org/1999/xhtml">
<head runat="server">
    <title>Untitled Page</title>
    
</head>
<body>
    <form id="form1" runat="server" >
    <div>
     <cc1:EventCalendarControl ID="EventCalendarControl1" runat="server" />
    </div>
    </form>
</body>
</html>

Try Step by Step

  1. If you want to know more about event calender DLL please go to this site  , and click these links for autocomplete or cascading dropdownlist, they are essential.
  2. Download event calender DLL from this article, and put it on your bin folder, and solution->Right Click->Add References->Browse->Bin->event calenderDLL->ok
  3. Refresh and Rebuild your solution: Build Menu > click Rebuild.
  4. Create database and tables like above, and add some rows which are your tasks or activities.
  5. Create Web Forms like something that I have described above.
  6. It is up to you if your tasks are in MS Project or you want to add them directly.
  7. you have to define your group and block as I mentioned above.
  8. You can add user profile and keep track time and cost for each group and block.
  9. Finally you can calculate variance in your project between your prediction and something which have happende in real.

History

Version 1 , 1th April 2012

Version 2,  22th April 2012, I have added C# code

Feedback

Feel free to leave any feedback on this article; it is a pleasure to see your offer and vote about this code. If you have any questions, please do not hesitate to ask me here.

License

This article, along with any associated source code and files, is licensed under The Code Project Open License (CPOL)


Written By
Doctorandin Technische Universität Berlin
Iran (Islamic Republic of) Iran (Islamic Republic of)
I have been working with different technologies and data more than 10 years.
I`d like to challenge with complex problem, then make it easy for using everyone. This is the best joy.

ICT Master in Norway 2013
Doctorandin at Technische Universität Berlin in Data Scientist ( currently )
-------------------------------------------------------------
Diamond is nothing except the pieces of the coal which have continued their activities finally they have become Diamond.

http://www.repocomp.com/

Comments and Discussions

 
GeneralMy vote of 5 Pin
armin nouriani20-Jun-12 20:40
armin nouriani20-Jun-12 20:40 
GeneralRe: My vote of 5 Pin
Mahsa Hassankashi14-Jul-12 12:42
Mahsa Hassankashi14-Jul-12 12:42 
QuestionReport for entire year... Pin
sijo43213-Jun-12 22:39
sijo43213-Jun-12 22:39 
GeneralMy vote of 5 Pin
JF201514-May-12 21:16
JF201514-May-12 21:16 
GeneralRe: My vote of 5 Pin
Mahsa Hassankashi15-May-12 14:08
Mahsa Hassankashi15-May-12 14:08 
Generalmy vote of 5 Pin
Uday P.Singh5-May-12 1:04
Uday P.Singh5-May-12 1:04 
GeneralRe: my vote of 5 Pin
Mahsa Hassankashi7-May-12 2:44
Mahsa Hassankashi7-May-12 2:44 
GeneralMy vote of 5 Pin
Member 432084425-Apr-12 10:11
Member 432084425-Apr-12 10:11 
GeneralRe: My vote of 5 Pin
Mahsa Hassankashi29-Apr-12 13:50
Mahsa Hassankashi29-Apr-12 13:50 
AnswerRe: My vote of 5 Pin
Member 43208441-May-12 8:51
Member 43208441-May-12 8:51 
GeneralRe: My vote of 5 Pin
Mahsa Hassankashi1-May-12 10:38
Mahsa Hassankashi1-May-12 10:38 
GeneralMy vote of 5 Pin
Rajesh Pillai14-Apr-12 0:32
Rajesh Pillai14-Apr-12 0:32 
GeneralRe: My vote of 5 Pin
Mahsa Hassankashi29-Apr-12 13:51
Mahsa Hassankashi29-Apr-12 13:51 
SuggestionMy Vote Of 4 Pin
Anurag Sarkar13-Apr-12 9:25
Anurag Sarkar13-Apr-12 9:25 
GeneralRe: My Vote Of 4 Pin
Mahsa Hassankashi13-Apr-12 13:47
Mahsa Hassankashi13-Apr-12 13:47 
GeneralRe: My Vote Of 4 Pin
fjdiewornncalwe19-Apr-12 9:57
professionalfjdiewornncalwe19-Apr-12 9:57 
GeneralRe: My Vote Of 4 Pin
Mahsa Hassankashi23-Apr-12 12:47
Mahsa Hassankashi23-Apr-12 12:47 
SuggestionRe: My Vote Of 4 Pin
thatraja4-May-12 20:53
professionalthatraja4-May-12 20:53 
GeneralRe: My Vote Of 4 Pin
JoseMenendez17-May-12 3:38
JoseMenendez17-May-12 3:38 
GeneralRe: My Vote Of 4 Pin
Mahsa Hassankashi18-May-12 5:11
Mahsa Hassankashi18-May-12 5:11 
GeneralMy vote of 3 Pin
Wade Beasley10-Apr-12 10:05
Wade Beasley10-Apr-12 10:05 
GeneralRe: My vote of 3 Pin
Mahsa Hassankashi10-Apr-12 12:20
Mahsa Hassankashi10-Apr-12 12:20 
GeneralMy vote of 4 Pin
237417-Apr-12 12:15
237417-Apr-12 12:15 
GeneralRe: My vote of 4 Pin
Mahsa Hassankashi9-Apr-12 7:01
Mahsa Hassankashi9-Apr-12 7:01 
GeneralRe: My vote of 4 Pin
237419-Apr-12 12:33
237419-Apr-12 12:33 

General General    News News    Suggestion Suggestion    Question Question    Bug Bug    Answer Answer    Joke Joke    Praise Praise    Rant Rant    Admin Admin   

Use Ctrl+Left/Right to switch messages, Ctrl+Up/Down to switch threads, Ctrl+Shift+Left/Right to switch pages.