Click here to Skip to main content
15,896,063 members
Articles / Web Development / ASP.NET
Article

A Time-of-Day Picker in JavaScript and ASP.NET

Rate me:
Please Sign up or sign in to vote.
4.00/5 (7 votes)
17 Jun 2008CPOL2 min read 37.4K   299   47   3
A web app that allows the user to pick time periods in the day in an ASP.NET page.

Image 1

Introduction

This is a web implementation for the WinForms Time-Of-Day Picker Control written previously here on CodeProject. This implementation allows the user to select different time periods during the day, straight from the web application.

Background

In order to implement the time period picker, I needed to find a client scripting library that allowed me to draw lines and highlight rectangles on the web browser. After Googling around a bit, I found this drawing library which enabled me to draw the initial static calendar.

Drawing the calendar was 50% of the work, the other 50% was to allow the user to highlight calendar cells on the mouse-down event, and stop highlighting them on the mouse-up event within a selection box, similar to the selection box of any graphics application like the Paint.

Using the code

The basic idea is to define a div area where the drawing will take place, then hook up the mouse events within that area to the appropriate drawing functions. In my ASPX file, I defined an area with an id="MyCanvas" as follows:

HTML
<div id="myCanvas" style="position:relative;height:230px;width:550px;" 
    onmousedown="StartSelection(event, this)" 
    onmousemove="HighlightCell(event, this)" 
    onmouseup="EndSelection(event, this)" 
    onmouseout="MouseExited(event, this)"></div>

In the above div, I hooked up the mouse-down event to StartSelection, the mouse-move to HighlightCell, the mouse-up to EndSelection, and finally, the mouse-out to MouseExited.

The StartSelection flags the initiation of cell highlight, which is then checked by HighlightCell to determine if the cell under the mouse should be highlighted as part of an ongoing selection or not. EndSelection simply turns off the selection flag so that subsequent calls to HiglightCell coming from the mouse-move event will not cause cell selection.

Finally, OnMouseExited is necessary to end the selection when the mouse simply exits the canvas area.

Points of interest

Initially, some global variables need to be defined:

JavaScript
var jg = new jsGraphics("myCanvas");
var xTextCellOffset=20;
var yTextCellOffset=10;
var daysCellWidth=150;
var daysCellHeight=30;
var timeChartGridWidth=400;
var timeChartGridHeight=daysCellHeight*7;
var cellWidth=timeChartGridWidth/24; // half an hour increments
var cellHeight=daysCellHeight;
var selectedCells=new Array();

In addition to the above drawing mechanism, some static functions are provided to draw the initial calendar. I've written some basic drawing routines that are built on top of the wz_jsgraphics drawing library mentioned above:

DrawGrid:

This function allows you to draw a grid starting at point (x, y) in pixels, with a certain width and height, while specifying the number of rows and columns:

JavaScript
function DrawGrid(x, y, width, height, numberOfRows, numberOfColumns)
{ 
    for(row=0; row<=numberOfRows; row++)
    {
        var rowInPixles=y+row*height/numberOfRows;
        jg.drawLine(x, rowInPixles, x+width, rowInPixles); 
    }

    for(col=0; col<=numberOfColumns; col++)
    {
        var colInPixles=x+col*width/numberOfColumns;
        jg.drawLine(colInPixles, y, colInPixles, y+height); 
    } 

}

DrawCalendar:

The function DrawCalendar takes a type of calendar (Islamic or Christian) and draws the days axis, the day time axis (with Friday being the first day for the Islamic calendar, and Sunday being the first day for the Christian calendar), and the hourly grid which is divided into 24 hours:

JavaScript
function DrawCalendar(type)
{

    // Reset Selection Memory
    selectedCells=new Array();

    // Highlight the active Calendar type
    if(type==1)
    {
        document.getElementById( "Islamic" ).style.color="Black";
        document.getElementById( "Christian" ).style.color="Gray";
    }
    else if(type==2)
    {
        document.getElementById( "Islamic" ).style.color="Gray";
        document.getElementById( "Christian" ).style.color="Black";
    }

    jg.clear();
    DrawDaysAxies(type);
    DrawTimeAxis();
    DrawTimeChartGrid(); 
    jg.paint();
}

And that's all there is to it!

License

This article, along with any associated source code and files, is licensed under The Code Project Open License (CPOL)


Written By
Web Developer
Jordan Jordan
Yousef Mannaa has been working as a software engineer for over 13 years. He has worked with many companies in the United States. His main specialty is ASP.NET and C#. He also have done many projects in C/C++ and Object Oriented Programming. Feel free to read his blog at http://www.mycsharpcorner.com. Contact him here http://www.mycsharpcorner.com/Contact.aspx

Comments and Discussions

 
QuestionHow do I send the selected timeslots? Pin
KevinWiesner20-Jun-08 9:24
KevinWiesner20-Jun-08 9:24 
GeneralGantt Chart Pin
HoyaSaxa9318-Jun-08 9:43
HoyaSaxa9318-Jun-08 9:43 
GeneralRe: Gantt Chart Pin
mycsharpcorner18-Jun-08 10:30
mycsharpcorner18-Jun-08 10:30 
Thanks for the comments. Yes, Gantt chart would be one application on top of this, another would be to create a heat map to show the busiest times in the week (rush hours...etc) by saving the data then averaging them out, then coloring the hour cells with varying color shades to represent the intensity and form a heat map.

The later is actually a project I'm working on, and will post it once ready to my blog at http://www.mycsharpcorner.com .

For more tips, go to: http://www.mycsharpcorner.com

General General    News News    Suggestion Suggestion    Question Question    Bug Bug    Answer Answer    Joke Joke    Praise Praise    Rant Rant    Admin Admin   

Use Ctrl+Left/Right to switch messages, Ctrl+Up/Down to switch threads, Ctrl+Shift+Left/Right to switch pages.